Plans¶
Forward-looking planning documents. Each plan owns its acceptance criteria, rollback story, and (where applicable) a research queue. Once a plan is delivered it gets archived under archive/.
Active¶
- Stage 1 — Rebuild — foundational rebuild after the research findings that reframed the problem.
- Stage 2 — Pair flow — pair-handshake forwarding through the dylib injection seam, Option δ shim layout, Phase D Go-only backend.
- Stage 2 / Phase C self-research queue — Q1-Q5 standalone tracker. All five questions resolved 2026-04-18; Q3's iter-1 through iter-4 closed the replay arc, and Phase D steps D.0 through D.5 have landed (Go backend byte-exact against iter-4 on havoc smoke test, 2026-04-19).
- Phase D.6.6-impl research questions —
open empirical questions that Phase D.6.6-impl deploy + verify
cycles will answer. Stable IDs (Q-D66-1..Q-D66-11), per-question
empirical test plans, resolution log. Sourced from the session-11
walkthrough of
notes/session11-b-vs-c-and-doc-gaps.md. - Docs reorganization — this very migration plan, with execution phases, ADR list, and the October 2026 reevaluation point for the docs engine.
Archive¶
See archive/ for plans that have been superseded or
delivered. Filenames carry an absolute date prefix
(YYYY-MM-shortname.md) so chronology survives the topic grouping.